Matrix

PROJECT OVERVIEW

  • 183,000 SF speculative warehouse
  • ESFR sprinkler system
  • 24 installed dock positions with seals & mechanical levelers
  • Two (2) drive-in ramps
  • 60 mil fully adhered EPDM roof system with interior roof drains
  • 1,200 AMP electrical service
  • Load bearing insulated pre-cast construction

Falken Tire

  • 215,000 SF BTS
  • 3,600 SF office space
  • ESFR sprinkler system
  • 34 dock doors with combination shelters
  • 17 dock doors with hydraulic levelers, control panel & combination lights/fans
  • 17 dock doors with mechanical levelers
  • 7” unreinforced floor slab
  • 60’ loading/staging bay
  • 30 FC average lighting level utilizing T-5 fluorescent fixtures
  • 60 mil fully adhered EPDM roof system with interior roof drains
  • Secured truck access with fenced truck court & 10’ concrete screen walls
  • 1,600 AMP electrical service
  • Load bearing insulated pre-cast construction